1 — Kitchen Size
2 — Finish Level
3 — What’s Included?
Why Prime Custom?
- ✓Class A Licensed & BBB Accredited
- ✓In-house designers — one team, one contract
- ✓Financing at 6.99% APR, 5-year terms
- ✓3 showrooms: Vienna · Sterling · Arlington
2026 Kitchen Remodel Costs in Northern Virginia by Size and Finish Level
Typical turnkey kitchen remodel costs from 300+ completed Prime Custom projects across Fairfax, Loudoun, and Arlington counties:
| Kitchen Size | Practical | Standard | Premium | Ultra-Luxury |
|---|---|---|---|---|
| Small (under 100 sq ft) | $15K–$28K | $30K–$50K | $50K–$80K | $80K–$130K |
| Medium (100–200 sq ft) | $22K–$40K | $45K–$75K | $75K–$120K | $120K–$175K |
| Large (200–300 sq ft) | $35K–$60K | $65K–$100K | $100K–$155K | $155K–$220K |
| Extra Large (300+ sq ft) | $50K–$80K | $85K–$130K | $130K–$190K | $190K–$280K+ |
Structural changes (wall removal, kitchen island, layout reconfiguration) add $15K–$30K. Appliances are excluded and typically purchased separately.
Kitchen Remodel Cost FAQs for Northern Virginia Homeowners
How much does a kitchen remodel cost in Northern Virginia?
Most kitchen remodels in Northern Virginia range from $15,000 to $280,000, depending on kitchen size and finish level. A practical refresh of a small kitchen (under 100 sq ft) starts around $15,000–$30,000. A mid-range project — the most common in NOVA — involves a medium kitchen with semi-custom cabinets and quartz countertops and runs $45,000–$75,000. Full custom renovations with premium millwork, stone countertops, and luxury appliances in larger kitchens in McLean, Great Falls, or Vienna can reach $130,000–$280,000.
Northern Virginia costs run 10–15% higher than national averages due to local labor rates, permit fees in Fairfax and Arlington counties, and the premium materials that buyers in this market expect.
Does a kitchen remodel add value to your home in Northern Virginia?
Yes — and in Northern Virginia's high-demand real estate market, a well-executed kitchen remodel consistently adds more in listing price than it costs. A standard mid-range kitchen ($45K–$75K) typically increases your home's market value by $70,000–$165,000. Premium projects in Vienna, McLean, and Great Falls — where homes average $900K–$1.5M — regularly add $160,000–$340,000 to what buyers are willing to pay.
The key is matching the finish level to the neighborhood. Over-building for your street dilutes returns; under-building in a premium area leaves money on the table. That's why Prime Custom's 3D design consultation starts with a comparable sales analysis before recommending a scope.
What's included in a kitchen remodel estimate?
A turnkey kitchen remodel includes: custom or semi-custom cabinetry, countertops (quartz, granite, or natural stone), backsplash tile, flooring (hardwood, LVP, or tile), lighting and electrical upgrades (recessed, pendant, under-cabinet), plumbing and fixture installation, and appliance installation coordination. Layout changes — such as removing a load-bearing wall, adding a kitchen island, or reconfiguring the floor plan — add $15,000–$30,000 to the base cost and require structural engineering and permits.
Appliances themselves are typically excluded from remodel estimates and purchased separately. Wolf, Sub-Zero, and Thermador packages commonly add $15,000–$40,000 on top of the remodel cost.
How long does a kitchen remodel take in Northern Virginia?
A typical kitchen remodel takes 8–14 weeks from signed contract to final walkthrough. The design phase — 3D renderings, material selections, and permit drawings — takes 3–5 weeks. Permitting in Fairfax County, Arlington, and Loudoun can add 2–4 weeks depending on scope. Active construction runs 4–8 weeks for most kitchens.
Prime Custom's design-build model — in-house designers, project managers, and craftsmen under one contract — eliminates the coordination delays that add weeks when homeowners hire separate architects, designers, and contractors.
What are the biggest cost factors in a kitchen remodel?
The four biggest drivers are: (1) Kitchen size — larger footprints require more materials, more labor hours, and more complex logistics. (2) Finish level — the gap between stock cabinetry and fully custom millwork alone can be $30,000–$80,000. (3) Structural scope — wall removal, load-bearing changes, and floor plan reconfigurations add significant cost and permit time. (4) Appliance tier — entry-level integrated appliances vs. Wolf/Sub-Zero can swing the budget by $20,000–$40,000.
How do I get an accurate kitchen remodel quote in Northern Virginia?
Use the calculator above to get an instant ballpark, then book a free in-home consultation with one of Prime Custom's designers. We visit your home, measure the space, review your wish list, and provide a detailed line-item estimate — typically within 5–7 business days. We have three showrooms in Vienna, Sterling, and Arlington where you can see full-scale kitchen displays and material samples before committing to a design direction.